Rail trails
Rail trails to ride
Old railway lines turned into long, gentle riding. Each trail below is summarised from its managers’ own pages, with the date we checked. Conditions change after rain, so check the official status before you set out.
Brisbane Valley, QLD
Brisbane Valley Rail Trail
- Length
- 161 km
- Route
- Wulkuraka (west of Ipswich) to Yarraman, through Fernvale, Lowood, Esk, Toogoolawah, Moore, Linville and Blackbutt.
- Surface
- Mostly compacted gravel with some rocky sections; rough and uphill from Linville to Benarkin.
- Who can use it
- Walkers, bike riders and horse riders. Road bikes are not recommended.
- Status
- Status not checked recently. Check the official source before you ride. Latest status
Sources: Department of Transport and Main Roads: About the trail · Department of Transport and Main Roads: Need to know (works and closures). Checked 2 November 2026.
Read the Brisbane Valley Rail Trail guideSouth Burnett and Gympie region, QLD
Kilkivan to Kingaroy Rail Trail
- Length
- 88 km
- Route
- Kilkivan to Kingaroy, through Goomeri, Murgon, Wondai, Tingoora, Wooroolin, Memerambi and Crawford.
- Surface
- Sealed for 43 km from Kingaroy to Murgon; unsealed from Murgon to Kilkivan.
- Who can use it
- Sealed Kingaroy to Murgon path: walkers and cyclists only. Unsealed Kilkivan to Murgon path: best for bushwalkers, mountain-bike riders and horse riders.
- Status
- Status not checked recently. Check the official source before you ride. Latest status
Sources: South Burnett Regional Council: Rail Trail · Gympie Regional Council: Kilkivan to Kingaroy Rail Trail. Checked 2 November 2026.
Roveloa guide coming later
Northern Rivers, NSW
Northern Rivers Rail Trail
- Length
- 53.7 km open in three sections; more planned
- Route
- Open: Murwillumbah to Crabbes Creek (24 km), Casino to Bentley (13.4 km) and Lismore to Bentley (16.3 km). Lismore to Booyong is seeking funding; Booyong to Crabbes Creek is in planning.
- Surface
- Compacted gravel, with asphalt near Murwillumbah station, between Burringbar and Mooball, and at key entry points.
- Who can use it
- Check the official site for who may use each section.
- Status
- Status not checked recently. Check the official source before you ride. Latest status
Sources: Northern Rivers Rail Trail: construction and timelines. Checked 2 November 2026.
Roveloa guide coming later
Status is shown for 14 days after we check it. Ride files and route maps will be added only where their owners allow it. Spotted something out of date? Report a correction.
More places to ride: all destinations · events calendar